Building Installation

Installation Started

This table includes buildings for which installation is in process or failed without completing.

Installed Buildings

This table includes all buildings successfully installed and active in Tracer Ensemble.

Note: To retain an installation log for an Installed Building, you need to save the report before deleting the building.

Possible Error Messages

Related topics