Global Override: Change or release Override
- This is one of a series of pages for creating a global override.
- For Apply at Priority Level, select the priority level at which you want to apply your override. If competing overrides (or releases of overrides) are received for a single object, those with a higher priority level will be applied and those with a lower priority will be ignored. Based upon settings for your user profile, your maximum priority level may be limited.
- For the actual value of the override, select one of the following:
- Specify a value for Change Value To. The available values depend upon the type of object you are overriding.
- Select Release to remove any current override on the point.
Related topics